Skip to main content

what does your quote for a Steel Framed Buildings mean?

No matter what size or specifications that you need for your Steel Framed Building, getting a quote or knowing what you actually need or what you don’t need can be difficult to understand.

Bellow is a diagram that shows everything you need to know about what your measurements mean and what the terminology means.

Building Length: Mesurement of one long side of the building to the other. 
Building Width: Measurement across the Gable end, from one side to the other.
Building Eaves Height:  Measurement ground level to where the wall meets the roof at the gutter.
Number of bays: the division of the front elevation usually in 15ft or 20ft bays. 
Roof Cladding: The material that covers the roof usually box profile steel sheeting or fibre cement, to include purlins and eaves beams.
Gutters and downpipes: UPVC downpipes that take the rain water off the roof into a soak away.
 wall cladding: Usually box profile steel sheeting, or Yorkshire boarding.
Composite cladding: Box profile Steel sheeting with composite insulation to required thicknesses.
Skylights: Transparent GRP skylights, which are fitted between the regular roof cladding to allow natural light into the building. 
Doors: Buildings uk offer a choice of doors, including single and three phase roller shutter doors, sliding and barn doors.
Personnel Doors: Most buildings will require at least one personnel door for easy access in to your building.

If you require any further information about your quote, or would like a free no obligation quotation
Contact our friendly and experienced sales team on:
01299 488988
or
info@buildings-uk.com
Click here for our Facebook page. Like us for our latest offers
click here for our Website 


Comments

Popular posts from this blog

Work in progress- 60x40x12 building

Latest job is a 60x40x12,  building supplied and erected by Buildings uk . This job included full steelwork, Fibre Cement Roof, Yorkshire boarding, concrete panels, and sliding doors  If you would like a free quotation or more information on what we could offer you, contact us. 01299 488988 info@buildings-uk.com Find us on  Facebook Visit our  Website

Changes to permitted development rights

Today the Government announced changes to the permitted development rights for agricultural buildings.  The key changes to note are: ⇾ An increase in the size of new agricultural buildings from a maximum of 465 square metres to a maximum of 1000 square metres ⇾Changes to the rights for conversion of agricultural buildings to dwellinghouses to allow: • Up to 3 larger homes within a maximum of 465 square metres • Up to 5 smaller homes each no larger than 100 square metres • A mix of both, within a total of no more than 5 homes, of which no more than 3 may be large homes  ⇾A one-year extension to the temporary permitted development right to convert storage and distribution buildings to residential use. Changes will come into effect from 6th April 2018.

Organic Farming

Non-organic food production promotes the use of pesticides and chemicals which can pollute water and the environment by making their way into the food chain. Many pesticides don’t just kill the target pest, they can affect other wildlife by contaminating watercourses or disrupting ecosystems. In contrast, Organic farming doesn’t allow any synthetic pesticides and herbicides. Research suggests that if all UK farming was organic, pesticide use would drop by 98%! Meaning that organic farms are a haven for wildlife. In organic farming, natural alternatives are used to control pests and disease. Including crop rotations, encouraging natural predators, and good soil will promote better, healthy and pest free crops. Organic farmers are allowed to use just 15 pesticides, originating from natural ingredients including citronella and clove oil, but they can only be used under very restricted circumstances. Here at Buildings uk, we provide the very highest standard of...